Project record
Improvements to Road from 9.50 Km on C.T.R. Road to Karahally
PMGSY-I · package KN-02-32 · Devanahalli block · Completed
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Improvements to Road from 9.50 Km on C.T.R. Road to Karahally
OMMAS lists PMGSY-I work KN-02-32 as “Improvements to Road from 9.50 Km on C.T.R. Road to Karahally”.
Road Name / Bridge Name: Improvements to Road from 9.50 Km on C.T.R. Road to Karahally
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Project / work ID
KN-02-32
OMMAS package number KN-02-32.
Package No.: KN-02-32
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Contractor
S R RAVI
OMMAS lists the contractor for this work as “S R RAVI”.
Contractor Name: S R RAVI [02 Jul 2007]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹396.40 lakh
The sanction cost is recorded as 396.40 (₹ lakh).
Sanction Cost: 396.40
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Maintenance cost due
₹29.22 lakh
The “5 Years Maintenance Cost Due” column shows 29.22 (₹ lakh).
5 Years Maintenance Cost Due: 29.22
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2008
The completion date column reads “Financial: 20-05-2009/ Physical: 30-06-2008”; the physical completion date is 30-06-2008.
Completion Date: Financial: 20-05-2009/ Physical: 30-06-2008
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
19.500 km
Road length 19.500 km; 19.500 km recorded as completed.
Road Length (Kms): 19.500
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3