Project record
Improvements to road from Marasandra to NH 207
PMGSY-I · package KN-02-42 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Improvements to road from Marasandra to NH 207
OMMAS lists PMGSY-I work KN-02-42 as “Improvements to road from Marasandra to NH 207”.
Road Name / Bridge Name: Improvements to road from Marasandra to NH 207
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Project / work ID
KN-02-42
OMMAS package number KN-02-42.
Package No.: KN-02-42
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Contractor
BASAYYA SWAMY
OMMAS lists the contractor for this work as “BASAYYA SWAMY”.
Contractor Name: BASAYYA SWAMY [27 Aug 2007]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹344.10 lakh
The sanction cost is recorded as 344.10 (₹ lakh).
Sanction Cost: 344.10
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Maintenance cost due
₹28.73 lakh
The “5 Years Maintenance Cost Due” column shows 28.73 (₹ lakh).
5 Years Maintenance Cost Due: 28.73
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2009
The completion date column reads “Financial: 23-03-2018/ Physical: 30-06-2009”; the physical completion date is 30-06-2009.
Completion Date: Financial: 23-03-2018/ Physical: 30-06-2009
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
19.200 km
Road length 19.200 km; 19.200 km recorded as completed.
Road Length (Kms): 19.200
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8