Project record
Improvements to road from Hosakote Chickathirupathi road to S Narayanakere via Makanahally
PMGSY-I · package KN-02-44 · Hosakote block · Completed
- Location
- Hosakote block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-I work KN-02-44 as “Improvements to road from Hosakote Chickathirupathi road to S Narayanakere via Makanahally”.
Road Name / Bridge Name: Improvements to road from Hosakote Chickathirupathi road to S Narayanakere via Makanahally
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Project / work ID
KN-02-44
OMMAS package number KN-02-44.
Package No.: KN-02-44
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Contractor
K L Manjunath Reddy
OMMAS lists the contractor for this work as “K L Manjunath Reddy”.
Contractor Name: K L Manjunath Reddy [31 Jul 2007]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹274.50 lakh
The sanction cost is recorded as 274.50 (₹ lakh).
Sanction Cost: 274.50
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Maintenance cost due
₹19.48 lakh
The “5 Years Maintenance Cost Due” column shows 19.48 (₹ lakh).
5 Years Maintenance Cost Due: 19.48
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2008
The completion date column reads “Financial: 30-01-2010/ Physical: 31-05-2008”; the physical completion date is 31-05-2008.
Completion Date: Financial: 30-01-2010/ Physical: 31-05-2008
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
13.000 km
Road length 13.000 km; 13.000 km recorded as completed.
Road Length (Kms): 13.000
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13