Project record
Banavadi main road to Modalakote
PMGSY-I · package KN0203 · Nelamangala block · Completed
- Location
- Nelamangala block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Banavadi main road to Modalakote
OMMAS lists PMGSY-I work KN0203 as “Banavadi main road to Modalakote”.
Road Name / Bridge Name: Banavadi main road to Modalakote
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Project / work ID
KN0203
OMMAS package number KN0203.
Package No.: KN0203
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Contractor
MGANESH
OMMAS lists the contractor for this work as “MGANESH”.
Contractor Name: MGANESH [04 Jul 2001]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹46.07 lakh
The sanction cost is recorded as 46.07 (₹ lakh).
Sanction Cost: 46.07
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2003
The completion date column reads “Financial: 01-04-2005/ Physical: 31-07-2003”; the physical completion date is 31-07-2003.
Completion Date: Financial: 01-04-2005/ Physical: 31-07-2003
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.700 km
Road length 7.700 km; 7.700 km recorded as completed.
Road Length (Kms): 7.700
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 16