Project record
Bommanahally to N.G.Halli
PMGSY-I · package KN0204 · Devanahalli block · Maintenance
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Bommanahally to N.G.Halli
OMMAS lists PMGSY-I work KN0204 as “Bommanahally to N.G.Halli”.
Road Name / Bridge Name: Bommanahally to N.G.Halli
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Project / work ID
KN0204
OMMAS package number KN0204.
Package No.: KN0204
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Contractor
B MUNIKRISHNAPPA
OMMAS lists the contractor for this work as “B MUNIKRISHNAPPA”.
Contractor Name: B MUNIKRISHNAPPA [28 Jan 2003]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹10.63 lakh
The sanction cost is recorded as 10.63 (₹ lakh).
Sanction Cost: 10.63
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2005
The completion date column reads “Financial: 01-04-2005/ Physical: 31-08-2005”; the physical completion date is 31-08-2005.
Completion Date: Financial: 01-04-2005/ Physical: 31-08-2005
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.500 km
Road length 1.500 km; 1.500 km recorded as completed.
Road Length (Kms): 1.500
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 2
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 0 National and 1 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 0; NQM* Grade: --; SQM# Inspection Count: 1; SQM# Grade: Satisfactory
[12]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 1