Chikkathaggali to Thagali Hosahalli

PMGSY-I · package KN0209 · Hosakote block · Maintenance

Location
Hosakote block, Bengaluru Rural district
Alignment drawn
none published: found by name
Documents
3
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

Chikkathaggali to Thagali Hosahalli

OMMAS lists PMGSY-I work KN0209 as “Chikkathaggali to Thagali Hosahalli”.

Road Name / Bridge Name: Chikkathaggali to Thagali Hosahalli

[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Project / work ID

KN0209

OMMAS package number KN0209.

VerifiedOfficial record

Responsible agency

DPIU Of Bangalore r

The programme implementation unit is recorded as “DPIU Of Bangalore r”.

Programme Implementation Unit: DPIU Of Bangalore r

[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Contractor

Karnataka Land Army Corporation

OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.

Contractor Name: Karnataka Land Army Corporation [07 Jul 2002]

[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹8.51 lakh

The sanction cost is recorded as 8.51 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

31-03-2004

The completion date column reads “Financial: 01-04-2005/ Physical: 31-03-2004”; the physical completion date is 31-03-2004.

Completion Date: Financial: 01-04-2005/ Physical: 31-03-2004

[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

1.500 km

Road length 1.500 km; 1.500 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record

Quality inspection

Satisfactory

Quality monitoring, Jan 2016 to Sep 2026: 0 National and 1 State Quality Monitor inspection(s); grade recorded “Satisfactory”.

NQM* Inspection Count: 0; NQM* Grade: --; SQM# Inspection Count: 1; SQM# Grade: Satisfactory

[12]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 3

VerifiedOfficial record