Project record
Islampura to Kannegowdanahally
PMGSY-I · package KN0209 · Nelamangala block · Completed
- Location
- Nelamangala block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Islampura to Kannegowdanahally
OMMAS lists PMGSY-I work KN0209 as “Islampura to Kannegowdanahally”.
Road Name / Bridge Name: Islampura to Kannegowdanahally
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Project / work ID
KN0209
OMMAS package number KN0209.
Package No.: KN0209
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Contractor
Karnataka Land Army Corporation
OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.
Contractor Name: Karnataka Land Army Corporation [07 Jul 2002]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹9.99 lakh
The sanction cost is recorded as 9.99 (₹ lakh).
Sanction Cost: 9.99
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2004
The completion date column reads “Financial: 01-04-2005/ Physical: 31-03-2004”; the physical completion date is 31-03-2004.
Completion Date: Financial: 01-04-2005/ Physical: 31-03-2004
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.300 km
Road length 1.300 km; 1.300 km recorded as completed.
Road Length (Kms): 1.300
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18