Project record
Ekarajapura - T09
PMGSY-I · package KN02101 · Hosakote block · Completed
- Location
- Hosakote block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Ekarajapura - T09
OMMAS lists PMGSY-I work KN02101 as “Ekarajapura - T09”.
Road Name / Bridge Name: Ekarajapura - T09
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Project / work ID
KN02101
OMMAS package number KN02101.
Package No.: KN02101
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Contractor
K. Kumar
OMMAS lists the contractor for this work as “K. Kumar”.
Contractor Name: K. Kumar [24 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹147.26 lakh
The sanction cost is recorded as 147.26 (₹ lakh).
Sanction Cost: 147.26
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Maintenance cost due
₹12.28 lakh
The “5 Years Maintenance Cost Due” column shows 12.28 (₹ lakh).
5 Years Maintenance Cost Due: 12.28
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2010
The completion date column reads “Financial: 04-10-2011/ Physical: 31-08-2010”; the physical completion date is 31-08-2010.
Completion Date: Financial: 04-10-2011/ Physical: 31-08-2010
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.820 km
Road length 5.820 km; 5.820 km recorded as completed.
Road Length (Kms): 5.820
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15