Project record
Bisanahalli - T01
PMGSY-I · package KN02103 · Hosakote block · Completed
- Location
- Hosakote block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Bisanahalli - T01
OMMAS lists PMGSY-I work KN02103 as “Bisanahalli - T01”.
Road Name / Bridge Name: Bisanahalli - T01
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Project / work ID
KN02103
OMMAS package number KN02103.
Package No.: KN02103
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Contractor
V Shivareddy
OMMAS lists the contractor for this work as “V Shivareddy”.
Contractor Name: V Shivareddy [24 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹74.64 lakh
The sanction cost is recorded as 74.64 (₹ lakh).
Sanction Cost: 74.64
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Maintenance cost due
₹7.01 lakh
The “5 Years Maintenance Cost Due” column shows 7.01 (₹ lakh).
5 Years Maintenance Cost Due: 7.01
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2010
The completion date column reads “Financial: 08-10-2010/ Physical: 31-05-2010”; the physical completion date is 31-05-2010.
Completion Date: Financial: 08-10-2010/ Physical: 31-05-2010
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.320 km
Road length 3.320 km; 3.320 km recorded as completed.
Road Length (Kms): 3.320
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 15