Project record
Nimbanahalli - T04
PMGSY-I · package KN02105 · Nelamangala block · Completed
- Location
- Nelamangala block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Nimbanahalli - T04
OMMAS lists PMGSY-I work KN02105 as “Nimbanahalli - T04”.
Road Name / Bridge Name: Nimbanahalli - T04
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Project / work ID
KN02105
OMMAS package number KN02105.
Package No.: KN02105
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Contractor
M.G.Hanumantharaju
OMMAS lists the contractor for this work as “M.G.Hanumantharaju”.
Contractor Name: M.G.Hanumantharaju [10 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹118.69 lakh
The sanction cost is recorded as 118.69 (₹ lakh).
Sanction Cost: 118.69
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Maintenance cost due
₹10.11 lakh
The “5 Years Maintenance Cost Due” column shows 10.11 (₹ lakh).
5 Years Maintenance Cost Due: 10.11
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2010
The completion date column reads “Financial: 01-10-2010/ Physical: 30-04-2010”; the physical completion date is 30-04-2010.
Completion Date: Financial: 01-10-2010/ Physical: 30-04-2010
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.790 km
Road length 4.790 km; 4.790 km recorded as completed.
Road Length (Kms): 4.790
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19