Project record
Devarahosahally - T05
PMGSY-I · package KN02106 · Nelamangala block · Completed
- Location
- Nelamangala block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Devarahosahally - T05
OMMAS lists PMGSY-I work KN02106 as “Devarahosahally - T05”.
Road Name / Bridge Name: Devarahosahally - T05
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Project / work ID
KN02106
OMMAS package number KN02106.
Package No.: KN02106
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Contractor
H SHIVAKUMAR
OMMAS lists the contractor for this work as “H SHIVAKUMAR”.
Contractor Name: H SHIVAKUMAR [25 Sep 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹183.26 lakh
The sanction cost is recorded as 183.26 (₹ lakh).
Sanction Cost: 183.26
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Maintenance cost due
₹17.45 lakh
The “5 Years Maintenance Cost Due” column shows 17.45 (₹ lakh).
5 Years Maintenance Cost Due: 17.45
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2010
The completion date column reads “Financial: 31-01-2011/ Physical: 31-07-2010”; the physical completion date is 31-07-2010.
Completion Date: Financial: 31-01-2011/ Physical: 31-07-2010
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.270 km
Road length 8.270 km; 8.270 km recorded as completed.
Road Length (Kms): 8.270
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 19