Project record
MRL3-Guduvanahalli to Avathi Via, Koramangala
PMGSY-II · package KN02110 · Devanahalli block · Maintenance
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL3-Guduvanahalli to Avathi Via, Koramangala
OMMAS lists PMGSY-II work KN02110 as “MRL3-Guduvanahalli to Avathi Via, Koramangala”.
Road Name / Bridge Name: MRL3-Guduvanahalli to Avathi Via, Koramangala
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Project / work ID
KN02110
OMMAS package number KN02110.
Package No.: KN02110
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Contractor
S ANNAPOORNA
OMMAS lists the contractor for this work as “S ANNAPOORNA”.
Contractor Name: S ANNAPOORNA [05 May 2014]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹263.01 lakh
The sanction cost is recorded as 263.01 (₹ lakh).
Sanction Cost: 263.01
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Maintenance cost due
₹21.09 lakh
The “5 Years Maintenance Cost Due” column shows 21.09 (₹ lakh).
5 Years Maintenance Cost Due: 21.09
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
15-05-2015
The completion date column reads “Financial: 14-11-2016/ Physical: 15-05-2015”; the physical completion date is 15-05-2015.
Completion Date: Financial: 14-11-2016/ Physical: 15-05-2015
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.210 km
Road length 7.210 km; 7.210 km recorded as completed.
Road Length (Kms): 7.210
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 1
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 2 National and 3 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 2; NQM* Grade: Satisfactory; SQM# Inspection Count: 3; SQM# Grade: Satisfactory
[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 1