MRL1-Balakune To Thavarekere NH-4 Via., Manchappnahally, Kalappnahally

PMGSY-II · package KN02116 · Hosakote block · Maintenance

Location
Hosakote block, Bengaluru Rural district
Alignment drawn
none published: found by name
Documents
3
Verified facts
11 of 11
11 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL1-Balakune To Thavarekere NH-4 Via., Manchappnahally, Kalappnahally

OMMAS lists PMGSY-II work KN02116 as “MRL1-Balakune To Thavarekere NH-4 Via., Manchappnahally, Kalappnahally”.

Road Name / Bridge Name: MRL1-Balakune To Thavarekere NH-4 Via., Manchappnahally, Kalappnahally

[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 2

VerifiedOfficial record

Project / work ID

KN02116

OMMAS package number KN02116.

VerifiedOfficial record

Responsible agency

DPIU Of Bangalore r

The programme implementation unit is recorded as “DPIU Of Bangalore r”.

Programme Implementation Unit: DPIU Of Bangalore r

[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 2

VerifiedOfficial record

Contractor

M N CHANDRASHEKARAIAH

OMMAS lists the contractor for this work as “M N CHANDRASHEKARAIAH”.

Contractor Name: M N CHANDRASHEKARAIAH [28 Feb 2014]

[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 2

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹188.77 lakh

The sanction cost is recorded as 188.77 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹14.44 lakh

The “5 Years Maintenance Cost Due” column shows 14.44 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

31-03-2015

The completion date column reads “Financial: 11-08-2016/ Physical: 31-03-2015”; the physical completion date is 31-03-2015.

Completion Date: Financial: 11-08-2016/ Physical: 31-03-2015

[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-II (CSV export), p. 2

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

4.940 km

Road length 4.940 km; 4.940 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record

Quality inspection

Satisfactory

Quality monitoring, Jan 2016 to Sep 2026: 1 National and 5 State Quality Monitor inspection(s); grade recorded “Satisfactory”.

NQM* Inspection Count: 1; NQM* Grade: Satisfactory; SQM# Inspection Count: 5; SQM# Grade: Satisfactory

[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 4

VerifiedOfficial record