MRL06-Kondasandra to MDR 22 via Thubagere, Nellugudige, Geddalapalya, Palpaldinne
PMGSY-III · package KN02123 · Doddaballapur block · Maintenance
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- 4.4 km · official GIS
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL06-Kondasandra to MDR 22 via Thubagere, Nellugudige, Geddalapalya, Palpaldinne
OMMAS lists PMGSY-III work KN02123 as “MRL06-Kondasandra to MDR 22 via Thubagere, Nellugudige, Geddalapalya, Palpaldinne”.
Road Name / Bridge Name: MRL06-Kondasandra to MDR 22 via Thubagere, Nellugudige, Geddalapalya, Palpaldinne
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Project / work ID
KN02123
OMMAS package number KN02123.
Package No.: KN02123
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Contractor
VINYAS BUILDERS
OMMAS lists the contractor for this work as “VINYAS BUILDERS”.
Contractor Name: VINYAS BUILDERS [15 Jun 2020]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹279.77 lakh
The sanction cost is recorded as 279.77 (₹ lakh).
Sanction Cost: 279.77
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹25.90 lakh
The “5 Years Maintenance Cost Due” column shows 25.90 (₹ lakh).
5 Years Maintenance Cost Due: 25.90
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
03-12-2021
The completion date column reads “Financial: 23-09-2022/ Physical: 03-12-2021”; the physical completion date is 03-12-2021.
Completion Date: Financial: 23-09-2022/ Physical: 03-12-2021
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.400 km
Road length 4.400 km; 4.310 km recorded as completed.
Road Length (Kms): 4.400
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 1 National and 8 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 1; NQM* Grade: Satisfactory; SQM# Inspection Count: 8; SQM# Grade: Satisfactory