MRL05-Doddakoliga MDR TO Doddanallurahally MDR VIA, Chikkanallurahally, Beguru , Beemakanahally, Bagalur

PMGSY-III · package KN02129 · Hosakote block · Maintenance

Location
Hosakote block, Bengaluru Rural district
Alignment drawn
22 m · official GIS
Documents
3
Verified facts
11 of 11
11 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

OMMAS lists PMGSY-III work KN02129 as “MRL05-Doddakoliga MDR TO Doddanallurahally MDR VIA, Chikkanallurahally, Beguru , Beemakanahally, Bagalur”.

Road Name / Bridge Name: MRL05-Doddakoliga MDR TO Doddanallurahally MDR VIA, Chikkanallurahally, Beguru , Beemakanahally, Bagalur

[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 2

VerifiedOfficial record

Project / work ID

KN02129

OMMAS package number KN02129.

VerifiedOfficial record

Responsible agency

DPIU Of Bangalore r

The programme implementation unit is recorded as “DPIU Of Bangalore r”.

Programme Implementation Unit: DPIU Of Bangalore r

[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 2

VerifiedOfficial record

Contractor

B.N. Devaraj

OMMAS lists the contractor for this work as “B.N. Devaraj”.

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹373.24 lakh

The sanction cost is recorded as 373.24 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹34.20 lakh

The “5 Years Maintenance Cost Due” column shows 34.20 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

01-06-2021

The completion date column reads “Financial: 17-08-2021/ Physical: 01-06-2021”; the physical completion date is 01-06-2021.

Completion Date: Financial: 17-08-2021/ Physical: 01-06-2021

[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 2

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

6.160 km

Road length 6.160 km; 6.126 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record

Quality inspection

Satisfactory

Quality monitoring, Jan 2016 to Sep 2026: 1 National and 11 State Quality Monitor inspection(s); grade recorded “Satisfactory”.

NQM* Inspection Count: 1; NQM* Grade: Satisfactory; SQM# Inspection Count: 11; SQM# Grade: Satisfactory

[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 4

VerifiedOfficial record