Project record
MRL17-NH-207 to Yelahanka Vijayapura Road(MDR-4) via, Haralur, Polanahally, Mattabaralu
PMGSY-III · package KN02135 · Devanahalli block · Maintenance
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- 6.7 km · official GIS
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL17-NH-207 to Yelahanka Vijayapura Road(MDR-4) via, Haralur, Polanahally, Mattabaralu
OMMAS lists PMGSY-III work KN02135 as “MRL17-NH-207 to Yelahanka Vijayapura Road(MDR-4) via, Haralur, Polanahally, Mattabaralu”.
Road Name / Bridge Name: MRL17-NH-207 to Yelahanka Vijayapura Road(MDR-4) via, Haralur, Polanahally, Mattabaralu
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Project / work ID
KN02135
OMMAS package number KN02135.
Package No.: KN02135
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Contractor
B.N. Devaraj
OMMAS lists the contractor for this work as “B.N. Devaraj”.
Contractor Name: B.N. Devaraj [18 May 2021]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹434.66 lakh
The sanction cost is recorded as 434.66 (₹ lakh).
Sanction Cost: 434.66
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹43.03 lakh
The “5 Years Maintenance Cost Due” column shows 43.03 (₹ lakh).
5 Years Maintenance Cost Due: 43.03
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
10-03-2022
The completion date column reads “Financial: 03-08-2022/ Physical: 10-03-2022”; the physical completion date is 10-03-2022.
Completion Date: Financial: 03-08-2022/ Physical: 10-03-2022
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.310 km
Road length 7.310 km; 7.310 km recorded as completed.
Road Length (Kms): 7.310
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-III (CSV export), p. 1
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 0 National and 9 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 0; NQM* Grade: --; SQM# Inspection Count: 9; SQM# Grade: Satisfactory
[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 2