Project record
D D Road to Obadenahalli
PMGSY-I · package KN0215 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
D D Road to Obadenahalli
OMMAS lists PMGSY-I work KN0215 as “D D Road to Obadenahalli”.
Road Name / Bridge Name: D D Road to Obadenahalli
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Project / work ID
KN0215
OMMAS package number KN0215.
Package No.: KN0215
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Contractor
C G CHANDRAPPA
OMMAS lists the contractor for this work as “C G CHANDRAPPA”.
Contractor Name: C G CHANDRAPPA [26 Jul 2004]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹15.60 lakh
The sanction cost is recorded as 15.60 (₹ lakh).
Sanction Cost: 15.60
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Maintenance cost due
₹1.21 lakh
The “5 Years Maintenance Cost Due” column shows 1.21 (₹ lakh).
5 Years Maintenance Cost Due: 1.21
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2005
The completion date column reads “Financial: 10-08-2007/ Physical: 30-06-2005”; the physical completion date is 30-06-2005.
Completion Date: Financial: 10-08-2007/ Physical: 30-06-2005
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.600 km
Road length 1.600 km; 1.600 km recorded as completed.
Road Length (Kms): 1.600
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 7