Project record
Baradi to Vadakunte
PMGSY-I · package KN0215 · Nelamangala block · Completed
- Location
- Nelamangala block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Baradi to Vadakunte
OMMAS lists PMGSY-I work KN0215 as “Baradi to Vadakunte”.
Road Name / Bridge Name: Baradi to Vadakunte
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Project / work ID
KN0215
OMMAS package number KN0215.
Package No.: KN0215
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Contractor
C G CHANDRAPPA
OMMAS lists the contractor for this work as “C G CHANDRAPPA”.
Contractor Name: C G CHANDRAPPA [26 Jul 2004]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹79.20 lakh
The sanction cost is recorded as 79.20 (₹ lakh).
Sanction Cost: 79.20
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Maintenance cost due
₹4.83 lakh
The “5 Years Maintenance Cost Due” column shows 4.83 (₹ lakh).
5 Years Maintenance Cost Due: 4.83
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2005
The completion date column reads “Financial: 10-08-2007/ Physical: 30-06-2005”; the physical completion date is 30-06-2005.
Completion Date: Financial: 10-08-2007/ Physical: 30-06-2005
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.400 km
Road length 6.400 km; 6.400 km recorded as completed.
Road Length (Kms): 6.400
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18