Project record
C T R Road - Doddachimanahalli
PMGSY-I · package KN0216 · Devanahalli block · Completed
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
C T R Road - Doddachimanahalli
OMMAS lists PMGSY-I work KN0216 as “C T R Road - Doddachimanahalli”.
Road Name / Bridge Name: C T R Road - Doddachimanahalli
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Project / work ID
KN0216
OMMAS package number KN0216.
Package No.: KN0216
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Contractor
V NARAYANASWAMY
OMMAS lists the contractor for this work as “V NARAYANASWAMY”.
Contractor Name: V NARAYANASWAMY [14 Jun 2004]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹11.50 lakh
The sanction cost is recorded as 11.50 (₹ lakh).
Sanction Cost: 11.50
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Maintenance cost due
₹0.71 lakh
The “5 Years Maintenance Cost Due” column shows 0.71 (₹ lakh).
5 Years Maintenance Cost Due: 0.71
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2007
The completion date column reads “Financial: 18-10-2007/ Physical: 30-06-2007”; the physical completion date is 30-06-2007.
Completion Date: Financial: 18-10-2007/ Physical: 30-06-2007
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
0.950 km
Road length 0.950 km; 0.950 km recorded as completed.
Road Length (Kms): 0.950
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 3