Project record
K S Road - Koratagere border
PMGSY-I · package KN0224 · Nelamangala block · Completed
- Location
- Nelamangala block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
K S Road - Koratagere border
OMMAS lists PMGSY-I work KN0224 as “K S Road - Koratagere border”.
Road Name / Bridge Name: K S Road - Koratagere border
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Project / work ID
KN0224
OMMAS package number KN0224.
Package No.: KN0224
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Contractor
H Narasimhamurthy
OMMAS lists the contractor for this work as “H Narasimhamurthy”.
Contractor Name: H Narasimhamurthy [25 Aug 2006]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹116.40 lakh
The sanction cost is recorded as 116.40 (₹ lakh).
Sanction Cost: 116.40
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Maintenance cost due
₹9.94 lakh
The “5 Years Maintenance Cost Due” column shows 9.94 (₹ lakh).
5 Years Maintenance Cost Due: 9.94
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2007
The completion date column reads “Financial: 04-11-2008/ Physical: 31-12-2007”; the physical completion date is 31-12-2007.
Completion Date: Financial: 04-11-2008/ Physical: 31-12-2007
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.000 km
Road length 8.000 km; 8.000 km recorded as completed.
Road Length (Kms): 8.000
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 18