Project record
IMPROVEMENTS TO ROAD FROM Y.H. ROAD TO DODDABALLAPURA TOWN
PMGSY-I · package KN0239 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
IMPROVEMENTS TO ROAD FROM Y.H. ROAD TO DODDABALLAPURA TOWN
OMMAS lists PMGSY-I work KN0239 as “IMPROVEMENTS TO ROAD FROM Y.H. ROAD TO DODDABALLAPURA TOWN”.
Road Name / Bridge Name: IMPROVEMENTS TO ROAD FROM Y.H. ROAD TO DODDABALLAPURA TOWN
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Project / work ID
KN0239
OMMAS package number KN0239.
Package No.: KN0239
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Contractor
M/s. Ganesh Enterprises Sri K B Ramesh
OMMAS lists the contractor for this work as “M/s. Ganesh Enterprises Sri K B Ramesh”.
Contractor Name: M/s. Ganesh Enterprises Sri K B Ramesh [02 Jul 2007]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹184.75 lakh
The sanction cost is recorded as 184.75 (₹ lakh).
Sanction Cost: 184.75
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Maintenance cost due
₹14.78 lakh
The “5 Years Maintenance Cost Due” column shows 14.78 (₹ lakh).
5 Years Maintenance Cost Due: 14.78
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2008
The completion date column reads “Financial: 28-07-2009/ Physical: 30-09-2008”; the physical completion date is 30-09-2008.
Completion Date: Financial: 28-07-2009/ Physical: 30-09-2008
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.860 km
Road length 9.860 km; 9.860 km recorded as completed.
Road Length (Kms): 9.860
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 8