Project record
IMPROVEMENTS ROAD FROM N.G.D ROAD - BEERAIRANAPALYA
PMGSY-I · package KN0241 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
IMPROVEMENTS ROAD FROM N.G.D ROAD - BEERAIRANAPALYA
OMMAS lists PMGSY-I work KN0241 as “IMPROVEMENTS ROAD FROM N.G.D ROAD - BEERAIRANAPALYA”.
Road Name / Bridge Name: IMPROVEMENTS ROAD FROM N.G.D ROAD - BEERAIRANAPALYA
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Project / work ID
KN0241
OMMAS package number KN0241.
Package No.: KN0241
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Contractor
M/s. Ganesh Enterprises Sri K B Ramesh
OMMAS lists the contractor for this work as “M/s. Ganesh Enterprises Sri K B Ramesh”.
Contractor Name: M/s. Ganesh Enterprises Sri K B Ramesh [02 Jul 2007]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹120.80 lakh
The sanction cost is recorded as 120.80 (₹ lakh).
Sanction Cost: 120.80
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Maintenance cost due
₹8.63 lakh
The “5 Years Maintenance Cost Due” column shows 8.63 (₹ lakh).
5 Years Maintenance Cost Due: 8.63
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2008
The completion date column reads “Financial: 22-04-2009/ Physical: 31-08-2008”; the physical completion date is 31-08-2008.
Completion Date: Financial: 22-04-2009/ Physical: 31-08-2008
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.760 km
Road length 5.760 km; 5.760 km recorded as completed.
Road Length (Kms): 5.760
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9