Project record
IMPROVEMETNS TO ROAD FROM NH 4 - UMMALU
PMGSY-I · package KN0245 · Hosakote block · Completed
- Location
- Hosakote block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
IMPROVEMETNS TO ROAD FROM NH 4 - UMMALU
OMMAS lists PMGSY-I work KN0245 as “IMPROVEMETNS TO ROAD FROM NH 4 - UMMALU”.
Road Name / Bridge Name: IMPROVEMETNS TO ROAD FROM NH 4 - UMMALU
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Project / work ID
KN0245
OMMAS package number KN0245.
Package No.: KN0245
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Contractor
M N CHANDRASHEKARAIAH
OMMAS lists the contractor for this work as “M N CHANDRASHEKARAIAH”.
Contractor Name: M N CHANDRASHEKARAIAH [27 Jun 2007]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹297.80 lakh
The sanction cost is recorded as 297.80 (₹ lakh).
Sanction Cost: 297.80
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Maintenance cost due
₹24.50 lakh
The “5 Years Maintenance Cost Due” column shows 24.50 (₹ lakh).
5 Years Maintenance Cost Due: 24.50
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2008
The completion date column reads “Financial: 25-06-2008/ Physical: 30-04-2008”; the physical completion date is 30-04-2008.
Completion Date: Financial: 25-06-2008/ Physical: 30-04-2008
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
16.350 km
Road length 16.350 km; 16.350 km recorded as completed.
Road Length (Kms): 16.350
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 13
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 0 National and 1 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 0; NQM* Grade: --; SQM# Inspection Count: 1; SQM# Grade: Satisfactory
[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 3