Project record
Jonnahalli - T-06
PMGSY-I · package KN0254 · Devanahalli block · Completed
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Jonnahalli - T-06
OMMAS lists PMGSY-I work KN0254 as “Jonnahalli - T-06”.
Road Name / Bridge Name: Jonnahalli - T-06
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Project / work ID
KN0254
OMMAS package number KN0254.
Package No.: KN0254
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Contractor
B.A. Shyam
OMMAS lists the contractor for this work as “B.A. Shyam”.
Contractor Name: B.A. Shyam [11 Jul 2008]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹113.90 lakh
The sanction cost is recorded as 113.90 (₹ lakh).
Sanction Cost: 113.90
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Maintenance cost due
₹8.12 lakh
The “5 Years Maintenance Cost Due” column shows 8.12 (₹ lakh).
5 Years Maintenance Cost Due: 8.12
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2009
The completion date column reads “Financial: 25-08-2009/ Physical: 30-04-2009”; the physical completion date is 30-04-2009.
Completion Date: Financial: 25-08-2009/ Physical: 30-04-2009
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.320 km
Road length 4.320 km; 4.320 km recorded as completed.
Road Length (Kms): 4.320
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4