Sevanagara - T-11
PMGSY-I · package KN0256 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Sevanagara - T-11
OMMAS lists PMGSY-I work KN0256 as “Sevanagara - T-11”.
Road Name / Bridge Name: Sevanagara - T-11
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Project / work ID
KN0256
OMMAS package number KN0256.
Package No.: KN0256
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Contractor
M/s. Ganesh Enterprises Sri K B Ramesh
OMMAS lists the contractor for this work as “M/s. Ganesh Enterprises Sri K B Ramesh”.
Contractor Name: M/s. Ganesh Enterprises Sri K B Ramesh [30 Jun 2008]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹342.77 lakh
The sanction cost is recorded as 342.77 (₹ lakh).
Sanction Cost: 342.77
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Maintenance cost due
₹26.43 lakh
The “5 Years Maintenance Cost Due” column shows 26.43 (₹ lakh).
5 Years Maintenance Cost Due: 26.43
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2009
The completion date column reads “Financial: 12-04-2010/ Physical: 30-09-2009”; the physical completion date is 30-09-2009.
Completion Date: Financial: 12-04-2010/ Physical: 30-09-2009
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
14.160 km
Road length 14.160 km; 14.160 km recorded as completed.
Road Length (Kms): 14.160
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9