Project record
Bankenahalli - T-13
PMGSY-I · package KN0284 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Bankenahalli - T-13
OMMAS lists PMGSY-I work KN0284 as “Bankenahalli - T-13”.
Road Name / Bridge Name: Bankenahalli - T-13
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Project / work ID
KN0284
OMMAS package number KN0284.
Package No.: KN0284
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Contractor
M/s. Ganesh Enterprises Sri K B Ramesh
OMMAS lists the contractor for this work as “M/s. Ganesh Enterprises Sri K B Ramesh”.
Contractor Name: M/s. Ganesh Enterprises Sri K B Ramesh [30 Jan 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹127.70 lakh
The sanction cost is recorded as 127.70 (₹ lakh).
Sanction Cost: 127.70
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Maintenance cost due
₹10.61 lakh
The “5 Years Maintenance Cost Due” column shows 10.61 (₹ lakh).
5 Years Maintenance Cost Due: 10.61
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2010
The completion date column reads “Financial: 09-02-2011/ Physical: 31-08-2010”; the physical completion date is 31-08-2010.
Completion Date: Financial: 09-02-2011/ Physical: 31-08-2010
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.380 km
Road length 5.380 km; 5.380 km recorded as completed.
Road Length (Kms): 5.380
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 9
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 0 National and 1 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 0; NQM* Grade: --; SQM# Inspection Count: 1; SQM# Grade: Satisfactory
[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 2