Project record
Kottigemachehalli - T-12
PMGSY-I · package KN0286 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kottigemachehalli - T-12
OMMAS lists PMGSY-I work KN0286 as “Kottigemachehalli - T-12”.
Road Name / Bridge Name: Kottigemachehalli - T-12
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Project / work ID
KN0286
OMMAS package number KN0286.
Package No.: KN0286
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Contractor
M/s. Ganesh Enterprises Sri K B Ramesh
OMMAS lists the contractor for this work as “M/s. Ganesh Enterprises Sri K B Ramesh”.
Contractor Name: M/s. Ganesh Enterprises Sri K B Ramesh [30 Jan 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹130.85 lakh
The sanction cost is recorded as 130.85 (₹ lakh).
Sanction Cost: 130.85
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Maintenance cost due
₹10.73 lakh
The “5 Years Maintenance Cost Due” column shows 10.73 (₹ lakh).
5 Years Maintenance Cost Due: 10.73
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2010
The completion date column reads “Financial: 13-04-2011/ Physical: 31-07-2010”; the physical completion date is 31-07-2010.
Completion Date: Financial: 13-04-2011/ Physical: 31-07-2010
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.440 km
Road length 5.440 km; 5.440 km recorded as completed.
Road Length (Kms): 5.440
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Quality inspection
Satisfactory
Quality monitoring, Jan 2016 to Sep 2026: 0 National and 1 State Quality Monitor inspection(s); grade recorded “Satisfactory”.
NQM* Inspection Count: 0; NQM* Grade: --; SQM# Inspection Count: 1; SQM# Grade: Satisfactory
[13]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore R, Jan 2016 to Sep 2026 (CSV export), p. 2