Project record
Kempapura - T09
PMGSY-I · package KN0287 · Hosakote block · Completed
- Location
- Hosakote block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kempapura - T09
OMMAS lists PMGSY-I work KN0287 as “Kempapura - T09”.
Road Name / Bridge Name: Kempapura - T09
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Project / work ID
KN0287
OMMAS package number KN0287.
Package No.: KN0287
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Contractor
B.N. Devaraj
OMMAS lists the contractor for this work as “B.N. Devaraj”.
Contractor Name: B.N. Devaraj [20 Feb 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹194.05 lakh
The sanction cost is recorded as 194.05 (₹ lakh).
Sanction Cost: 194.05
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Maintenance cost due
₹16.37 lakh
The “5 Years Maintenance Cost Due” column shows 16.37 (₹ lakh).
5 Years Maintenance Cost Due: 16.37
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-11-2009
The completion date column reads “Financial: 31-01-2011/ Physical: 30-11-2009”; the physical completion date is 30-11-2009.
Completion Date: Financial: 31-01-2011/ Physical: 30-11-2009
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.300 km
Road length 8.300 km; 8.300 km recorded as completed.
Road Length (Kms): 8.300
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14