Project record
M.Gangasandra - T01
PMGSY-I · package KN0288 · Hosakote block · Completed
- Location
- Hosakote block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
M.Gangasandra - T01
OMMAS lists PMGSY-I work KN0288 as “M.Gangasandra - T01”.
Road Name / Bridge Name: M.Gangasandra - T01
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Project / work ID
KN0288
OMMAS package number KN0288.
Package No.: KN0288
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Contractor
P N POLICE PATIL
OMMAS lists the contractor for this work as “P N POLICE PATIL”.
Contractor Name: P N POLICE PATIL [01 Dec 2008]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹186.10 lakh
The sanction cost is recorded as 186.10 (₹ lakh).
Sanction Cost: 186.10
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Maintenance cost due
₹14.97 lakh
The “5 Years Maintenance Cost Due” column shows 14.97 (₹ lakh).
5 Years Maintenance Cost Due: 14.97
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2011
The completion date column reads “Financial: 03-10-2011/ Physical: 31-03-2011”; the physical completion date is 31-03-2011.
Completion Date: Financial: 03-10-2011/ Physical: 31-03-2011
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.000 km
Road length 8.000 km; 8.000 km recorded as completed.
Road Length (Kms): 8.000
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 14