Project record
Juttanahalli - T10
PMGSY-I · package KN0294 · Devanahalli block · Completed
- Location
- Devanahalli block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Juttanahalli - T10
OMMAS lists PMGSY-I work KN0294 as “Juttanahalli - T10”.
Road Name / Bridge Name: Juttanahalli - T10
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Project / work ID
KN0294
OMMAS package number KN0294.
Package No.: KN0294
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Contractor
Dodda Rangaiah
OMMAS lists the contractor for this work as “Dodda Rangaiah”.
Contractor Name: Dodda Rangaiah [29 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹153.05 lakh
The sanction cost is recorded as 153.05 (₹ lakh).
Sanction Cost: 153.05
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Maintenance cost due
₹13.25 lakh
The “5 Years Maintenance Cost Due” column shows 13.25 (₹ lakh).
5 Years Maintenance Cost Due: 13.25
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2011
The completion date column reads “Financial: 15-03-2012/ Physical: 31-05-2011”; the physical completion date is 31-05-2011.
Completion Date: Financial: 15-03-2012/ Physical: 31-05-2011
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.280 km
Road length 6.280 km; 6.280 km recorded as completed.
Road Length (Kms): 6.280
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 4