Project record
Nagasandra - T01
PMGSY-I · package KN0296 · Doddaballapur block · Completed
- Location
- Doddaballapur block, Bengaluru Rural district
- Alignment drawn
- none published: found by name
- Documents
- 3
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Nagasandra - T01
OMMAS lists PMGSY-I work KN0296 as “Nagasandra - T01”.
Road Name / Bridge Name: Nagasandra - T01
[1]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Project / work ID
KN0296
OMMAS package number KN0296.
Package No.: KN0296
[2]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Responsible agency
DPIU Of Bangalore r
The programme implementation unit is recorded as “DPIU Of Bangalore r”.
Programme Implementation Unit: DPIU Of Bangalore r
[3]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Contractor
Dodda Rangaiah
OMMAS lists the contractor for this work as “Dodda Rangaiah”.
Contractor Name: Dodda Rangaiah [29 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹58.58 lakh
The sanction cost is recorded as 58.58 (₹ lakh).
Sanction Cost: 58.58
[5]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Maintenance cost due
₹5.46 lakh
The “5 Years Maintenance Cost Due” column shows 5.46 (₹ lakh).
5 Years Maintenance Cost Due: 5.46
[9]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2011
The completion date column reads “Financial: 24-12-2012/ Physical: 30-09-2011”; the physical completion date is 30-09-2011.
Completion Date: Financial: 24-12-2012/ Physical: 30-09-2011
[10]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.590 km
Road length 2.590 km; 2.590 km recorded as completed.
Road Length (Kms): 2.590
[7]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Bangalore R, PMGSY-I (CSV export), p. 10