Project record
MG road - Kandakanahally
PMGSY-I · package KN1902 · Chickballapur block · Completed
- Location
- Chickballapur block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MG road - Kandakanahally
OMMAS lists PMGSY-I work KN1902 as “MG road - Kandakanahally”.
Road Name / Bridge Name: MG road - Kandakanahally
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Project / work ID
KN1902
OMMAS package number KN1902.
Package No.: KN1902
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Contractor
B.Bhaskar Naidu
OMMAS lists the contractor for this work as “B.Bhaskar Naidu”.
Contractor Name: B.Bhaskar Naidu [18 Aug 2001]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹25.61 lakh
The sanction cost is recorded as 25.61 (₹ lakh).
Sanction Cost: 25.61
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2003
The completion date column reads “Financial: 01-04-2005/ Physical: 30-09-2003”; the physical completion date is 30-09-2003.
Completion Date: Financial: 01-04-2005/ Physical: 30-09-2003
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.000 km
Road length 5.000 km; 5.000 km recorded as completed.
Road Length (Kms): 5.000
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 4