Project record
Thimmayagarahalli - Approach road (T-04)
PMGSY-I · package KN19121 · Gudibanda block · Maintenance
- Location
- Gudibanda block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Thimmayagarahalli - Approach road (T-04)
OMMAS lists PMGSY-I work KN19121 as “Thimmayagarahalli - Approach road (T-04)”.
Road Name / Bridge Name: Thimmayagarahalli - Approach road (T-04)
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Project / work ID
KN19121
OMMAS package number KN19121.
Package No.: KN19121
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Contractor
M.Venkatesh
OMMAS lists the contractor for this work as “M.Venkatesh”.
Contractor Name: M.Venkatesh [20 Dec 2012]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹82.41 lakh
The sanction cost is recorded as 82.41 (₹ lakh).
Sanction Cost: 82.41
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Maintenance cost due
₹4.61 lakh
The “5 Years Maintenance Cost Due” column shows 4.61 (₹ lakh).
5 Years Maintenance Cost Due: 4.61
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2013
The completion date column reads “Financial: 13-01-2014/ Physical: 31-12-2013”; the physical completion date is 31-12-2013.
Completion Date: Financial: 13-01-2014/ Physical: 31-12-2013
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.860 km
Road length 1.860 km; 1.860 km recorded as completed.
Road Length (Kms): 1.860
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 16