Project record
Pasapalodu - Approach road (T-09)
PMGSY-I · package KN19122 · Gudibanda block · Maintenance
- Location
- Gudibanda block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Pasapalodu - Approach road (T-09)
OMMAS lists PMGSY-I work KN19122 as “Pasapalodu - Approach road (T-09)”.
Road Name / Bridge Name: Pasapalodu - Approach road (T-09)
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Project / work ID
KN19122
OMMAS package number KN19122.
Package No.: KN19122
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Contractor
B.G.GOVINDA RAJU
OMMAS lists the contractor for this work as “B.G.GOVINDA RAJU”.
Contractor Name: B.G.GOVINDA RAJU [31 Dec 2012]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹30.17 lakh
The sanction cost is recorded as 30.17 (₹ lakh).
Sanction Cost: 30.17
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Maintenance cost due
₹2.82 lakh
The “5 Years Maintenance Cost Due” column shows 2.82 (₹ lakh).
5 Years Maintenance Cost Due: 2.82
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2013
The completion date column reads “Financial: 26-03-2014/ Physical: 31-12-2013”; the physical completion date is 31-12-2013.
Completion Date: Financial: 26-03-2014/ Physical: 31-12-2013
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.140 km
Road length 1.140 km; 1.140 km recorded as completed.
Road Length (Kms): 1.140
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 17