Project record
Saragondlu - T-05
PMGSY-I · package KN19123 · Gowribidanur block · Maintenance
- Location
- Gowribidanur block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Saragondlu - T-05
OMMAS lists PMGSY-I work KN19123 as “Saragondlu - T-05”.
Road Name / Bridge Name: Saragondlu - T-05
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Project / work ID
KN19123
OMMAS package number KN19123.
Package No.: KN19123
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Contractor
M.Venkatesh
OMMAS lists the contractor for this work as “M.Venkatesh”.
Contractor Name: M.Venkatesh [20 Dec 2012]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹99.13 lakh
The sanction cost is recorded as 99.13 (₹ lakh).
Sanction Cost: 99.13
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Maintenance cost due
₹5.89 lakh
The “5 Years Maintenance Cost Due” column shows 5.89 (₹ lakh).
5 Years Maintenance Cost Due: 5.89
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2013
The completion date column reads “Financial: 19-12-2013/ Physical: 30-09-2013”; the physical completion date is 30-09-2013.
Completion Date: Financial: 19-12-2013/ Physical: 30-09-2013
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.380 km
Road length 2.380 km; 2.380 km recorded as completed.
Road Length (Kms): 2.380
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 14