Project record
Sultanapete
PMGSY-I · package KN1913 · Chickballapur block · Completed
- Location
- Chickballapur block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Sultanapete
OMMAS lists PMGSY-I work KN1913 as “Sultanapete”.
Road Name / Bridge Name: Sultanapete
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Project / work ID
KN1913
OMMAS package number KN1913.
Package No.: KN1913
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Contractor
B MUNIKRISHNAPPA
OMMAS lists the contractor for this work as “B MUNIKRISHNAPPA”.
Contractor Name: B MUNIKRISHNAPPA [15 Oct 2004]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹13.10 lakh
The sanction cost is recorded as 13.10 (₹ lakh).
Sanction Cost: 13.10
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Maintenance cost due
₹0.75 lakh
The “5 Years Maintenance Cost Due” column shows 0.75 (₹ lakh).
5 Years Maintenance Cost Due: 0.75
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2006
The completion date column reads “Financial: 31-01-2007/ Physical: 30-04-2006”; the physical completion date is 30-04-2006.
Completion Date: Financial: 31-01-2007/ Physical: 30-04-2006
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.000 km
Road length 1.000 km; 1.000 km recorded as completed.
Road Length (Kms): 1.000
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5