Project record
MRL3 - Belluti to Jangamakote
PMGSY-II · package KN19142 · Sidlaghatta block · Maintenance
- Location
- Sidlaghatta block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL3 - Belluti to Jangamakote
OMMAS lists PMGSY-II work KN19142 as “MRL3 - Belluti to Jangamakote”.
Road Name / Bridge Name: MRL3 - Belluti to Jangamakote
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Project / work ID
KN19142
OMMAS package number KN19142.
Package No.: KN19142
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Contractor
B.N. Devaraj
OMMAS lists the contractor for this work as “B.N. Devaraj”.
Contractor Name: B.N. Devaraj [01 Mar 2014]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹391.30 lakh
The sanction cost is recorded as 391.30 (₹ lakh).
Sanction Cost: 391.30
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Maintenance cost due
₹35.67 lakh
The “5 Years Maintenance Cost Due” column shows 35.67 (₹ lakh).
5 Years Maintenance Cost Due: 35.67
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2016
The completion date column reads “Financial: 20-12-2016/ Physical: 30-04-2016”; the physical completion date is 30-04-2016.
Completion Date: Financial: 20-12-2016/ Physical: 30-04-2016
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
11.300 km
Road length 11.300 km; 11.300 km recorded as completed.
Road Length (Kms): 11.300
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-II (CSV export), p. 2