Project record
Nagaragere - Bandarlahalli
PMGSY-I · package KN1929 · Gowribidanur block · Completed
- Location
- Gowribidanur block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Nagaragere - Bandarlahalli
OMMAS lists PMGSY-I work KN1929 as “Nagaragere - Bandarlahalli”.
Road Name / Bridge Name: Nagaragere - Bandarlahalli
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Project / work ID
KN1929
OMMAS package number KN1929.
Package No.: KN1929
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Contractor
Byrappa
OMMAS lists the contractor for this work as “Byrappa”.
Contractor Name: Byrappa [26 Mar 2007]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹121.00 lakh
The sanction cost is recorded as 121.00 (₹ lakh).
Sanction Cost: 121.00
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Maintenance cost due
₹9.03 lakh
The “5 Years Maintenance Cost Due” column shows 9.03 (₹ lakh).
5 Years Maintenance Cost Due: 9.03
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2008
The completion date column reads “Financial: 25-07-2008/ Physical: 31-07-2008”; the physical completion date is 31-07-2008.
Completion Date: Financial: 25-07-2008/ Physical: 31-07-2008
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.300 km
Road length 7.300 km; 7.300 km recorded as completed.
Road Length (Kms): 7.300
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 11