Project record
Avalabetta - T-15
PMGSY-I · package KN1965 · Chickballapur block · Completed
- Location
- Chickballapur block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Avalabetta - T-15
OMMAS lists PMGSY-I work KN1965 as “Avalabetta - T-15”.
Road Name / Bridge Name: Avalabetta - T-15
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Project / work ID
KN1965
OMMAS package number KN1965.
Package No.: KN1965
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Contractor
B N NANJUNDAPPA
OMMAS lists the contractor for this work as “B N NANJUNDAPPA”.
Contractor Name: B N NANJUNDAPPA [08 Sep 2008]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹137.00 lakh
The sanction cost is recorded as 137.00 (₹ lakh).
Sanction Cost: 137.00
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Maintenance cost due
₹2.98 lakh
The “5 Years Maintenance Cost Due” column shows 2.98 (₹ lakh).
5 Years Maintenance Cost Due: 2.98
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2010
The completion date column reads “Financial: 11-10-2010/ Physical: 31-05-2010”; the physical completion date is 31-05-2010.
Completion Date: Financial: 11-10-2010/ Physical: 31-05-2010
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.300 km
Road length 2.300 km; 2.300 km recorded as completed.
Road Length (Kms): 2.300
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 5