Project record
Anagattanahalli - T-04
PMGSY-I · package KN1970 · Gowribidanur block · Completed
- Location
- Gowribidanur block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Anagattanahalli - T-04
OMMAS lists PMGSY-I work KN1970 as “Anagattanahalli - T-04”.
Road Name / Bridge Name: Anagattanahalli - T-04
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Project / work ID
KN1970
OMMAS package number KN1970.
Package No.: KN1970
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Contractor
H.V. Chikkagarigareddy
OMMAS lists the contractor for this work as “H.V. Chikkagarigareddy”.
Contractor Name: H.V. Chikkagarigareddy [16 Jan 2009]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹95.00 lakh
The sanction cost is recorded as 95.00 (₹ lakh).
Sanction Cost: 95.00
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Maintenance cost due
₹1.91 lakh
The “5 Years Maintenance Cost Due” column shows 1.91 (₹ lakh).
5 Years Maintenance Cost Due: 1.91
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-10-2009
The completion date column reads “Financial: 05-06-2010/ Physical: 31-10-2009”; the physical completion date is 31-10-2009.
Completion Date: Financial: 05-06-2010/ Physical: 31-10-2009
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.360 km
Road length 3.360 km; 3.360 km recorded as completed.
Road Length (Kms): 3.360
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 13