Project record
Karadigutta - Bangalore-Kadapa Road
PMGSY-I · package KN1974 · Chinthamani block · Completed
- Location
- Chinthamani block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Karadigutta - Bangalore-Kadapa Road
OMMAS lists PMGSY-I work KN1974 as “Karadigutta - Bangalore-Kadapa Road”.
Road Name / Bridge Name: Karadigutta - Bangalore-Kadapa Road
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Project / work ID
KN1974
OMMAS package number KN1974.
Package No.: KN1974
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Contractor
K.S.VISHWANATHA REDDY
OMMAS lists the contractor for this work as “K.S.VISHWANATHA REDDY”.
Contractor Name: K.S.VISHWANATHA REDDY [28 Jan 2009]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹180.50 lakh
The sanction cost is recorded as 180.50 (₹ lakh).
Sanction Cost: 180.50
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Maintenance cost due
₹11.72 lakh
The “5 Years Maintenance Cost Due” column shows 11.72 (₹ lakh).
5 Years Maintenance Cost Due: 11.72
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-02-2010
The completion date column reads “Financial: 21-05-2011/ Physical: 28-02-2010”; the physical completion date is 28-02-2010.
Completion Date: Financial: 21-05-2011/ Physical: 28-02-2010
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.120 km
Road length 6.120 km; 6.120 km recorded as completed.
Road Length (Kms): 6.120
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 8