Project record
Kolar Sompoor Road - K.Muttkadahalli
PMGSY-I · package KN1977 · Sidlaghatta block · Completed
- Location
- Sidlaghatta block, Chikkaballapura district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kolar Sompoor Road - K.Muttkadahalli
OMMAS lists PMGSY-I work KN1977 as “Kolar Sompoor Road - K.Muttkadahalli”.
Road Name / Bridge Name: Kolar Sompoor Road - K.Muttkadahalli
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Project / work ID
KN1977
OMMAS package number KN1977.
Package No.: KN1977
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Contractor
M.Venkatesh
OMMAS lists the contractor for this work as “M.Venkatesh”.
Contractor Name: M.Venkatesh [28 Feb 2009]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹352.01 lakh
The sanction cost is recorded as 352.01 (₹ lakh).
Sanction Cost: 352.01
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Maintenance cost due
₹23.85 lakh
The “5 Years Maintenance Cost Due” column shows 23.85 (₹ lakh).
5 Years Maintenance Cost Due: 23.85
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-02-2010
The completion date column reads “Financial: 19-04-2011/ Physical: 28-02-2010”; the physical completion date is 28-02-2010.
Completion Date: Financial: 19-04-2011/ Physical: 28-02-2010
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
12.450 km
Road length 12.450 km; 12.450 km recorded as completed.
Road Length (Kms): 12.450
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-I (CSV export), p. 19