Project record
T01-Pathapalya to Pollanayakanahalli Via Kamsanapalli peddanagurlu
PMGSY-III · package KN3002 · Bagepalli block · Maintenance
- Location
- Bagepalli block, Chikkaballapura district
- Alignment drawn
- 11 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
T01-Pathapalya to Pollanayakanahalli Via Kamsanapalli peddanagurlu
OMMAS lists PMGSY-III work KN3002 as “T01-Pathapalya to Pollanayakanahalli Via Kamsanapalli peddanagurlu”.
Road Name / Bridge Name: T01-Pathapalya to Pollanayakanahalli Via Kamsanapalli peddanagurlu
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Project / work ID
KN3002
OMMAS package number KN3002.
Package No.: KN3002
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Contractor
K.N Channakeshava
OMMAS lists the contractor for this work as “K.N Channakeshava”.
Contractor Name: K.N Channakeshava [01 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹880.85 lakh
The sanction cost is recorded as 880.85 (₹ lakh).
Sanction Cost: 880.85
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹85.72 lakh
The “5 Years Maintenance Cost Due” column shows 85.72 (₹ lakh).
5 Years Maintenance Cost Due: 85.72
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
16-08-2023
The completion date column reads “Financial: 08-02-2024/ Physical: 16-08-2023”; the physical completion date is 16-08-2023.
Completion Date: Financial: 08-02-2024/ Physical: 16-08-2023
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
15.272 km
Road length 15.272 km; 13.770 km recorded as completed.
Road Length (Kms): 15.272
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1