Project record
MRL02-Alkapura gate To SH-94 Via Alkapura, Doddahanumenahalli, Bhumenahalli
PMGSY-III · package KN3003 · Gowribidanur block · Maintenance
- Location
- Gowribidanur block, Chikkaballapura district
- Alignment drawn
- 8 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL02-Alkapura gate To SH-94 Via Alkapura, Doddahanumenahalli, Bhumenahalli
OMMAS lists PMGSY-III work KN3003 as “MRL02-Alkapura gate To SH-94 Via Alkapura, Doddahanumenahalli, Bhumenahalli”.
Road Name / Bridge Name: MRL02-Alkapura gate To SH-94 Via Alkapura, Doddahanumenahalli, Bhumenahalli
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Project / work ID
KN3003
OMMAS package number KN3003.
Package No.: KN3003
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Contractor
S ANNAPOORNA
OMMAS lists the contractor for this work as “S ANNAPOORNA”.
Contractor Name: S ANNAPOORNA [26 Jun 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹215.01 lakh
The sanction cost is recorded as 215.01 (₹ lakh).
Sanction Cost: 215.01
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹24.58 lakh
The “5 Years Maintenance Cost Due” column shows 24.58 (₹ lakh).
5 Years Maintenance Cost Due: 24.58
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
11-01-2023
The completion date column reads “Financial: 23-01-2025/ Physical: 11-01-2023”; the physical completion date is 11-01-2023.
Completion Date: Financial: 23-01-2025/ Physical: 11-01-2023
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.207 km
Road length 4.207 km; 4.205 km recorded as completed.
Road Length (Kms): 4.207
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2