Project record
MRL12-Manchenahalli Thondebavi Road To near Beeramangala via Channabyranahalli, Rayarekalahalli, Bajjeranagenahalli, Mavinakayalahalli, Arkunda
PMGSY-III · package KN3004 · Gowribidanur block · Maintenance
- Location
- Gowribidanur block, Chikkaballapura district
- Alignment drawn
- 13 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN3004 as “MRL12-Manchenahalli Thondebavi Road To near Beeramangala via Channabyranahalli, Rayarekalahalli, Bajjeranagenahalli, Mavinakayalahalli, Arkunda”.
Road Name / Bridge Name: MRL12-Manchenahalli Thondebavi Road To near Beeramangala via Channabyranahalli, Rayarekalahalli, Bajjeranagenahalli, Mavinakayalahalli, Arkunda
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Project / work ID
KN3004
OMMAS package number KN3004.
Package No.: KN3004
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Contractor
JAYAPRAKASH ENGINEERS & CONTRACTORS
OMMAS lists the contractor for this work as “JAYAPRAKASH ENGINEERS & CONTRACTORS”.
Contractor Name: JAYAPRAKASH ENGINEERS & CONTRACTORS [01 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹699.94 lakh
The sanction cost is recorded as 699.94 (₹ lakh).
Sanction Cost: 699.94
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹74.19 lakh
The “5 Years Maintenance Cost Due” column shows 74.19 (₹ lakh).
5 Years Maintenance Cost Due: 74.19
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
15-03-2024
The completion date column reads “Financial: 12-12-2024/ Physical: 15-03-2024”; the physical completion date is 15-03-2024.
Completion Date: Financial: 12-12-2024/ Physical: 15-03-2024
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
13.211 km
Road length 13.211 km; 12.970 km recorded as completed.
Road Length (Kms): 13.211
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2