Project record
MRL07-SH(Near Gollachinnenahalli) To Anegambarayaswamy Temple Via Narasapura Gullaganjihalli Dasarenahalli
PMGSY-III · package KN3005 · Gowribidanur block · Maintenance
- Location
- Gowribidanur block, Chikkaballapura district
- Alignment drawn
- 149 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN3005 as “MRL07-SH(Near Gollachinnenahalli) To Anegambarayaswamy Temple Via Narasapura Gullaganjihalli Dasarenahalli”.
Road Name / Bridge Name: MRL07-SH(Near Gollachinnenahalli) To Anegambarayaswamy Temple Via Narasapura Gullaganjihalli Dasarenahalli
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Project / work ID
KN3005
OMMAS package number KN3005.
Package No.: KN3005
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Contractor
S ANNAPOORNA
OMMAS lists the contractor for this work as “S ANNAPOORNA”.
Contractor Name: S ANNAPOORNA [26 Jun 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹487.95 lakh
The sanction cost is recorded as 487.95 (₹ lakh).
Sanction Cost: 487.95
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹51.00 lakh
The “5 Years Maintenance Cost Due” column shows 51.00 (₹ lakh).
5 Years Maintenance Cost Due: 51.00
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
05-03-2022
The completion date column reads “Financial: 22-01-2025/ Physical: 05-03-2022”; the physical completion date is 05-03-2022.
Completion Date: Financial: 22-01-2025/ Physical: 05-03-2022
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.950 km
Road length 8.950 km; 8.802 km recorded as completed.
Road Length (Kms): 8.950
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2