Project record

T01-MDR to Paragodu via Bathalahalli, Dapparthi, Gavikuntahalli, Adinaraganahalli, Hampasandra, Bagepalli Taluk Yandrakayalapalli, Devireddypalli

PMGSY-III · package KN3007 · Gudibanda block · Maintenance

Location
Gudibanda block, Chikkaballapura district
Alignment drawn
6.2 km · official GIS
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

OMMAS lists PMGSY-III work KN3007 as “T01-MDR to Paragodu via Bathalahalli, Dapparthi, Gavikuntahalli, Adinaraganahalli, Hampasandra, Bagepalli Taluk Yandrakayalapalli, Devireddypalli”.

Road Name / Bridge Name: T01-MDR to Paragodu via Bathalahalli, Dapparthi, Gavikuntahalli, Adinaraganahalli, Hampasandra, Bagepalli Taluk Yandrakayalapalli, Devireddypalli

[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Project / work ID

KN3007

OMMAS package number KN3007.

VerifiedOfficial record

Responsible agency

DPIU Of Chikkaballapur

The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.

Programme Implementation Unit: DPIU Of Chikkaballapur

[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Contractor

M.Venkatesh

OMMAS lists the contractor for this work as “M.Venkatesh”.

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹820.40 lakh

The sanction cost is recorded as 820.40 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹86.99 lakh

The “5 Years Maintenance Cost Due” column shows 86.99 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

27-04-2022

The completion date column reads “Financial: 19-07-2022/ Physical: 27-04-2022”; the physical completion date is 27-04-2022.

Completion Date: Financial: 19-07-2022/ Physical: 27-04-2022

[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

15.424 km

Road length 15.424 km; 14.834 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record