Project record
MRL13-Chinnasandra To BC Road Via Nayindrahalli Colony
PMGSY-III · package KN3011 · Chinthamani block · Maintenance
- Location
- Chinthamani block, Chikkaballapura district
- Alignment drawn
- 15 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL13-Chinnasandra To BC Road Via Nayindrahalli Colony
OMMAS lists PMGSY-III work KN3011 as “MRL13-Chinnasandra To BC Road Via Nayindrahalli Colony”.
Road Name / Bridge Name: MRL13-Chinnasandra To BC Road Via Nayindrahalli Colony
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Project / work ID
KN3011
OMMAS package number KN3011.
Package No.: KN3011
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Contractor
G Chandre Gowda
OMMAS lists the contractor for this work as “G Chandre Gowda”.
Contractor Name: G Chandre Gowda [01 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹768.09 lakh
The sanction cost is recorded as 768.09 (₹ lakh).
Sanction Cost: 768.09
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹82.34 lakh
The “5 Years Maintenance Cost Due” column shows 82.34 (₹ lakh).
5 Years Maintenance Cost Due: 82.34
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
18-12-2021
The completion date column reads “Financial: 28-03-2022/ Physical: 18-12-2021”; the physical completion date is 18-12-2021.
Completion Date: Financial: 28-03-2022/ Physical: 18-12-2021
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
14.540 km
Road length 14.540 km; 14.540 km recorded as completed.
Road Length (Kms): 14.540
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 2