Project record
MRL05-Ganjikunte SH to Pollakuntahalli (MDR) via Doddabadragatta, Chikkabandragatta, Hakkipikki Calony, Poolakuntla halli.
PMGSY-III · package KN3013 · Sidlaghatta block · Maintenance
- Location
- Sidlaghatta block, Chikkaballapura district
- Alignment drawn
- 27 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN3013 as “MRL05-Ganjikunte SH to Pollakuntahalli (MDR) via Doddabadragatta, Chikkabandragatta, Hakkipikki Calony, Poolakuntla halli.”.
Road Name / Bridge Name: MRL05-Ganjikunte SH to Pollakuntahalli (MDR) via Doddabadragatta, Chikkabandragatta, Hakkipikki Calony, Poolakuntla halli.
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Project / work ID
KN3013
OMMAS package number KN3013.
Package No.: KN3013
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Contractor
M.Venkatesh
OMMAS lists the contractor for this work as “M.Venkatesh”.
Contractor Name: M.Venkatesh [04 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹310.00 lakh
The sanction cost is recorded as 310.00 (₹ lakh).
Sanction Cost: 310.00
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Maintenance cost due
₹32.95 lakh
The “5 Years Maintenance Cost Due” column shows 32.95 (₹ lakh).
5 Years Maintenance Cost Due: 32.95
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
01-06-2022
The completion date column reads “Financial: 26-07-2022/ Physical: 01-06-2022”; the physical completion date is 01-06-2022.
Completion Date: Financial: 26-07-2022/ Physical: 01-06-2022
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.000 km
Road length 6.000 km; 6.000 km recorded as completed.
Road Length (Kms): 6.000
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 3