Project record
MRL04-NH-7 To Kethenahalli MDR Via Kalukunte Ittapanahalli And Mogalaguppe Gollahalli
PMGSY-III · package KN3017 · Chickballapur block · Maintenance
- Location
- Chickballapur block, Chikkaballapura district
- Alignment drawn
- 34 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL04-NH-7 To Kethenahalli MDR Via Kalukunte Ittapanahalli And Mogalaguppe Gollahalli
OMMAS lists PMGSY-III work KN3017 as “MRL04-NH-7 To Kethenahalli MDR Via Kalukunte Ittapanahalli And Mogalaguppe Gollahalli”.
Road Name / Bridge Name: MRL04-NH-7 To Kethenahalli MDR Via Kalukunte Ittapanahalli And Mogalaguppe Gollahalli
[1]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Project / work ID
KN3017
OMMAS package number KN3017.
Package No.: KN3017
[2]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Chikkaballapur
The programme implementation unit is recorded as “DPIU Of Chikkaballapur”.
Programme Implementation Unit: DPIU Of Chikkaballapur
[3]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Contractor
B.N. Devaraj
OMMAS lists the contractor for this work as “B.N. Devaraj”.
Contractor Name: B.N. Devaraj [01 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹400.35 lakh
The sanction cost is recorded as 400.35 (₹ lakh).
Sanction Cost: 400.35
[5]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹38.26 lakh
The “5 Years Maintenance Cost Due” column shows 38.26 (₹ lakh).
5 Years Maintenance Cost Due: 38.26
[9]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
09-01-2022
The completion date column reads “Financial: 28-09-2022/ Physical: 09-01-2022”; the physical completion date is 09-01-2022.
Completion Date: Financial: 28-09-2022/ Physical: 09-01-2022
[10]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.876 km
Road length 6.876 km; 6.875 km recorded as completed.
Road Length (Kms): 6.876
[7]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Chikkaballapura, PMGSY-III (CSV export), p. 1